“GLOBAL BLOCK”, “GLOBAL FOAM” and “GB-ML”
Application
Wall Penetrations · Penetr. Of Non-Combustible Pipes 800 Mm

Supply and installation of protection for penetrations of uninsulated non-combustible pipes with certified EI 120 fire resistance in plasterboard walls, composed of GLOBAL BLOCK BRICKS, made of pre-formed intumescent foam, dim. 144 x 200 x 60 mm, and of the SLEEVE for uninsulated non-combustible pipes “GB-ML”, consisting of a mat 500 mm long, 30 mm thk., in glass wool felt, density 90 kg/m³, in accordance with classification report I.G. 336525/3812FR and Technical File 399960. It is necessary to line the internal sides of the opening with a triple layer of FIREGUARD® 13 boards, thk. 3x12,7 mm, over a width of 600 mm, and to lay the “GLOBAL BLOCK” BRICKS on edge to a thickness of 60 mm at the two ends of the lining. Remove the protective film and install them
in courses, taking care to fit them perfectly into the opening and to stagger them as in an ordinary masonry wall. Near the penetrating services, cut the BRICKS to the required dimensions with a knife. Gaps between cables and joints, empty areas and perimeter infill areas of the opening must be filled with the “GLOBAL FOAM” FOAM, to a depth of 60 mm. Measure the diameter of the pipe to be protected and cut the quantity of SLEEVE “GB-ML” required to cover it. Wrap it around the pipe, overlapping it at the joint area by at least 100 mm and taking care that it adheres to the wall. Secure the SLEEVE “GB-ML” with twisted steel wire ties.
Downloads reserved for registered users with a confirmed email address. Register · Sign in